Skip to content

This page explains how C.Scale estimates the embodied carbon of a building's enclosure: exterior walls, curtain walls, windows, roofs and exterior doors. It covers how C.Scale calculates enclosure areas, the fields for each part of the enclosure, and the default insulating values. The generic materials behind each assembly are on Material Data.

C.Scale calculates enclosure areas from the Form and Massing inputs: building perimeter, floor-to-floor height and window-to-wall ratio (WWR). Areas are calculated for each floor above grade and added together.

Solid Exterior Wall area=(1−WWR)∗Perimeter∗F2F HeightSolid \ Exterior \ Wall \ area = (1-WWR) \ast Perimeter \ast F2F \ Height Glazed area=WWR∗Perimeter∗F2F HeightGlazed \ area = WWR \ast Perimeter \ast F2F \ Height Roof area=Largest above grade floor areaRoof \ area = Largest \ above \ grade \ floor \ area

The default Window-to-Wall Ratio is 0.45. If you don't enter a Building Perimeter, C.Scale assumes a square floor plate, with a perimeter of four times the square root of the area of one floor.

In Detailed Design, you enter the area of each assembly, and C.Scale shows the window-to-wall ratio that results.

If you don't enter a Floor-to-Floor Height, C.Scale uses the default for the building's use. For a building with more than one use, C.Scale weights the defaults by the floor area of each use.

Use CategoriesDefault F2F Height (ft)Default F2F Height (m)
Multifamily Housing, Single Family Home, Dormitory, Hotel, Senior Care Facility, Parking (Conditioned), Parking (Unconditioned)12 feet3.7 meters
Office, K-12 School, University/College, Medical Clinic, Pre-school / Day Care, Restaurant, Retail Store, Fitness Center13 feet4.0 meters
Assembly, Aquarium, Fire Station, Library, Museum, Performing Arts, Post Office, Stadium, Transit Station, Worship Facility, Zoo15 feet4.6 meters
Hospital, Laboratory16 feet4.9 meters
Convention Center18 feet5.5 meters
Distribution Center, Warehouse, Data Center20 feet6.1 meters

C.Scale models every enclosure assembly by area. Each assembly carries a full material inventory, built from your choices and from industry guidance and standard North American construction practice.

In Simple Design, you choose a typical assembly for three parts of the enclosure, each with an Existing to Remain percentage:

  • Exterior Walls: Typical Cladding Assembly
  • Curtain Walls: Typical Glazing Assembly
  • Roofs: Typical Roofing Assembly

In Simple Design, all of the glazed area is modeled as curtain wall, and Windows and Exterior Doors stay empty.

In Detailed Design, the enclosure has five sections. To add an assembly to a section, click New Takeoff, then New Assembly. Enter its area and choose a value for each field:

SectionFields
Exterior WallsCladding, Continuous Insulation, Sheathing, Framing, Cavity Insulation
Curtain WallsCurtain wall frame, Vision glazing
WindowsWindow frame, Glazing
RoofsRoofing Assembly, Cover Board, Roof Insulation
Exterior DoorsNo assembly fields. Click New Takeoff, then New Material, to add doors as materials.

The insulation fields also take an R-value. The R-value is hidden when you choose None.

The C.Scale enclosure model uses Payette Kaleidoscope takeoffs data for some assemblies by permission. Find the full citation for these data in the Reference Data section of the methodology. Other assembly information is sourced from product literature and industry guidance.

C.Scale calculates the amount of continuous wall insulation and roof insulation from the assembly's R-value. If you don't enter an R-value, C.Scale uses the default for the project's ASHRAE climate zone. If the climate zone is unknown, the default is R-25. Cavity insulation defaults to R-0, so enter its R-value.

ASHRAE Climate ZoneExterior Wall R-Value DefaultRoofing R-Value Default
Climate Zone 0R-18R-30
Climate Zone 1R-18R-30
Climate Zone 2R-18R-30
Climate Zone 3R-20R-30
Climate Zone 4R-21R-33
Climate Zone 5R-23R-33
Climate Zone 6R-26R-36
Climate Zone 7R-26R-41
Climate Zone 8R-29R-41

For each assembly, C.Scale calculates material quantities per unit of assembly area. C.Scale automatically multiplies these per-area quantities by the total assembly area to produce a consistent material inventory for the project. This allows models to be updated easily as takeoffs evolve throughout the design process.

Don't see an assembly or material you need? Reach out to our team. We're continually expanding our enclosure library and welcome requests.

C.Scale © 2023-2026 Climate Scale Inc. All rights reserved.