Skip to content

Working Across C.Scale and Tally 2.0

Connect a Revit model to a C.Scale scenario so the model's takeoffs reach C.Scale. There, anyone on the project can follow the design without opening Revit, see the takeoffs alongside the rest of the project, such as energy use, services, refrigerants and sitework, and compare the project in a portfolio.

Each sync overwrites them again. Other inputs in the scenario, such as energy use, services, refrigerants and sitework, stay as they are.

The connection is made in Tally 2.0 and stored in the Revit model.

  1. In Tally 2.0, open Project Data, then C.Scale Connection.
  2. Choose a Project and a Scenario, then click Connect. Tally 2.0 sends the model's takeoffs to the scenario straight away.
  3. After you change the model, click Sync to send its current takeoffs. Tally 2.0 never syncs on its own.

For more, such as changing or removing the connection, see Modeling in Tally 2.0.

Synced takeoffs show a Tally 2.0 chip, and Tally 2.0 in the Method column. They are read-only in C.Scale. To change one, change the Revit model and sync again.

The scenario takes part in compare charts and portfolios like any other.

  • Tally 2.0: the Results view and its exports, and the LEED Comparison and Full Results PDF reports. See Reporting.
  • C.Scale: project reports, AIA 2030 DDx exports and the LEED v4.1 and CALGreen compliance views. See Project Reports and AIA DDx Reporting.

Synced Tally 2.0 takeoffs can't be used in C.Scale's AIA 2030, SE 2050, LEED or CALGreen reports yet.

C.Scale © 2023-2026 Climate Scale Inc. All rights reserved.