> For the complete documentation index, see [llms.txt](https://docs.cscale.io/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs.

# Reporting

Report from Tally 2.0: the Results view and its exports, the LEED Comparison and Full Results PDFs, and where synced takeoffs appear in C.Scale.

Tally 2.0 reports results on the **Results** screen, as files you export, and as PDF reports. Once the model is connected to C.Scale, its takeoffs also appear in the connected scenario in C.Scale.

## Results

Results cover mass and six impact categories: Global Warming Potential, Acidification Potential, Eutrophication Potential, Ozone Depletion Potential, Smog Formation Potential and Abiotic depletion potential - fossil. View them as a **Graph**, **Table** or **Timeline**, grouped by division, life cycle stage, material, Revit category, family, building element or sub-element. Show totals or **per GFA**.

![Impacts by category and life cycle stage.](https://docs.cscale.io/images/tally-chart-results.png)

Click **Download** to export:

* **Vector (SVG)** and **Image (PNG)** of the chart
* **Tabular Data (CSV)**, in Table view
* **Full Results (JSON)** and **Full Results (CSV)**
* **Full Results (PDF)**
* **LEED Comparison (PDF)**, for a Design Option Comparison or Full Building Comparison

## PDF reports

Each report opens a dialog, **Export Report** or **Export LEED Comparison Report**, where you add the author, company, project phase, goal and scope of assessment, and a cover image. The LEED report also asks for the **Proposed** and **Baseline** options and the **Key Changes Baseline vs Proposed**.

* **Full Results** covers every option in the study. It includes operational energy (B6) when you have entered it, and splits each total into embodied and operational emissions.
* **LEED Comparison** covers a **Proposed** and a **Baseline** design option that you choose, and leaves out operational energy. It leads with the reduction of each impact from the baseline to the proposed building. Use it for LEED v4.1 whole-building LCA reporting.

## Synced takeoffs in C.Scale

After you sync a model to a C.Scale scenario, the synced takeoffs appear in that scenario's charts, in compare charts and in portfolios. See [Working Across C.Scale and Tally 2.0](https://docs.cscale.io/overview/working-across-c-scale-and-tally.md).

> **Coming soon:** AIA 2030, SE 2050 and CALGreen reporting from Tally 2.0.
